This project, which is arguably within the most prestigious shopping area in the world, saw Blou continue their working relationship with Sir Robert McAlpine.
Due to the hectic surroundings and never sleeping building, Blou had to carry out works through the night and ensure materials and plant were delivered to site at exactly the right time.
The works comprised of the manufacture and installation of approximately 100 fire rated door sets throughout back of house and reception area, which provided access to the newly fitted-out restaurant, fully fitted with stainless steel ironmongery.
Within Blou’s scope was also the fit-out to the new ground floor reception and the building of a window lining/cladding detailed from the ground to 5th floor, comprising solely of non-combustible materials designed by Blou.